Another day

Jelle Syngenta -1

07:03 AM

First things first: checking the main malfunctions and any outstanding issues. What’s working and what isn’t? Let’s go!

07:41 AM

First stop: Project 802 'the acounting and packing installation'. Something isn’t running quite right, so it’s time to find the cause.

Jelle Syngenta -3

08:56 AM

A discussion at the production line. How can we improve this machine’s output?

Jelle Syngenta -4

10:18 AM

A quick call with a supplier. A machine currently being built in Spain is running behind schedule.

Jelle Syngenta -6

11:32 AM

Checking the latest technical drawing for the new processing line. Then it’s time for lunch.

Jelle Syngenta -7

01:15 PM

A walk through the temporary processing hall to make sure everything meets the required safety standards.

02:50 PM

500 seeds per bag. Not one more, not one less. It never gets old, so it’s worth taking a quick look before the next meeting starts.

Jelle Syngenta -9

04:14 PM

One last round along the line. Everything’s running smoothly. It’s never truly finished, but that’s exactly what makes engineering so fascinating.

Jelle Syngenta profielfotoJelleProject Engineer

Between the production floor and technical puzzles.

Behind every machine or installation lies a clever piece of engineering. As a Project Engineer, Jelle works on making everything better, smarter and more efficient. From testing new packaging lines to coordinating contractors and fine-tuning machines. 10,000 steps a day? Easy.